FreePrimavera P6 → Excel · nothing to install

Convert your P6 schedule
to Excel in seconds

From .XER to structured Excel — WBS, colors, and collapsible groups just like in Primavera

Drop your .XER file here

click here to browse

Free plan: 3 conversions per month · unlimited on Pro

From P6 to Excel in three steps.

Turn your Primavera P6 .XER file into a complete Excel spreadsheet — with the full WBS, colors by hierarchy level, and standard-format dates — exactly like the original schedule.

Primavera P6 — source

Primavera P6 Professional — EC00515.xer
Activity IDActivity NameDur.StartFinish
EC00515City Center Office Building68101-Nov-1003-Jul-13
D&EDesign and Engineering10701-Nov-1006-Apr-11
EC1000Design Building Addition5501-Nov-1019-Jan-11
EC1050Assemble Technical Data716-Feb-1125-Feb-11
FoundFoundation14623-Feb-1119-Sep-11
EC1100Site Preparation4323-Feb-1118-Apr-11
Gamtty converts

Excel — Gamtty output

EC00515 — Cronograma.xlsx
Activity IDActivity NameDur.StartFinish
EC00515City Center Office Building68101/11/201003/07/2013
D&EDesign and Engineering10701/11/201006/04/2011
EC1000Design Building Addition5501/11/201019/01/2011
EC1050Assemble Technical Data716/02/201125/02/2011
FoundFoundation14623/02/201119/09/2011
EC1100Site Preparation4323/02/201118/04/2011
1

Send the .XER file

Exported straight from Primavera P6, by drag or selection. Files up to 100 MB.

2

Gamtty rebuilds the WBS

Full hierarchy reassembled level by level, with calendars, durations and dates converted automatically.

3

Download the formatted Excel

Collapsible groups, colors per level and standard dates — ready for meetings and reports.

Nothing to install · no formatting lost · 100% in the browser
Gamtty Workspace

Gamtty Pro

The shortest path between planning and the decision.

From .xer to final report: S-Curve, dashboards, EVM KPIs, and DCMA audit — calculated straight from your Primavera P6, no intermediate spreadsheet. Your project: less spreadsheet, more planning.

app.gamtty.com — Dashboards
Gamtty / DataCenter Construction
Executive Dashboard Dynamic
Schedule
SV — Schedule Variance
-170.3M
Schedule
SPI
0.45
Cost
CPI
1.01
S-CurveDynamic
Budget (Baseline)ActualRemaining
Data date31%71%88%95%100%53%82%
Resource LevelingAvailability limit
Within limitOverallocated

Faithful reproduction of the interface — build yours with your project's saved items, in a free layout

app.gamtty.com/curva-s
Financial Curve
Dynamic
Budget (Baseline)ActualRemaining
100%75%50%25%Data date · Jul/2621%47%73%89%96%100%53%86%

S-Curve

The S-Curve your client asks for, without leaving the browser

Baseline × Actual × Remaining calculated with P6's real calendar and Primavera's own resource curves. Physical or financial, in custom periods.

  • Automatic split at the Data Date
  • Labels in % or values, zoom, and full screen
  • Dynamic Mode: updates itself with every new schedule
app.gamtty.com/kpis

EVM KPIs

13 EVM indicators calculated on the spot

SPI, CPI, EAC, PPC, schedule and cost variances — straight from the baseline × current comparison, with the Earned Value criteria audits recognize.

  • Saved cards per project, one-click recalculation
  • Comparison across schedule revisions
  • Physical and financial kept separate, as EVM requires
app.gamtty.com/dcma
Attention
Point 1
Lógica
100% · limit 5%
OK
Point 2
Leads
0% · limit 0%
OK
Point 3
Lags
0% · limit 5%
OK
Point 4
Tipos de Relação
0 occurrences
OK
Point 5
Restrições Rígidas
0% · limit 5%
Attention
Point 6
Folga Alta
71.8% · limit 5%
Attention
Point 7
Folga Negativa
28% · limit 0%
OK
Point 13
CPLI
1.00 · min. 0.95
Attention
Point 14
BEI
0.34 · min. 0.95

Schedule quality

14-Point DCMA audit in seconds

The same checklist used by agencies and major contractors to fail schedules — run it before your client does.

  • Logic, float, constraints, CPLI, and BEI
  • Per-activity detail on every point
  • Baseline integrity across 6 dimensions included
app.gamtty.com/relatorio-geral
General Report
Choose what goes into the PDF.
KPIs (EVM)
S-Curve
Resource Charts
14-Point DCMA
Milestones
Critical Path
Float Analysis
Notes
Download PDF
Schedule General Report
DataCenter Construction
Generated by Gamtty on 14/07/2026
BaselineDataCenter_Rev0 — Baseline.xer
CurrentDataCenter_Corrente_Jul26.xer

Full Report

The entire status report, in PDF, in one click

Choose the sections — KPIs, curves, charts, DCMA, milestones, critical path — and Gamtty builds a laid-out PDF, ready for the meeting.

  • Cover and branding ready to present
  • Charts in landscape pages, readable
  • Notes and action plan in the document itself

More features included in Pro

Six capabilities that come with the subscription, on top of the S-Curve, the KPIs and the DCMA audit.

Baseline Adherence

Scope, weighting, logic, duration, critical path, and milestones — baseline × current across 6 dimensions.

6 dimensões

Escopo4
Ponderação2
Lógica11
Duração7
Caminho Crítico3
Marcosnenhuma

Contract Milestones

Each milestone's status recalculated automatically with every new schedule import.

Marcos

Liberação da área−3 d
Fundação concluídano prazo
Montagem eletromecânica+12 d
Comissionamento+18 d
Aceitação final

Multiple Revisions

Compare as many schedule versions as you want, without losing your analysis history.

Cronogramas do projeto

Rev0 — Baselinebaseline
Corrente Mai/26
Corrente Jun/26
Corrente Jul/26ativo

Flexible Export

Standard Excel, custom with 27 columns or consolidated into six sheets — plus the General Report as a laid-out PDF.

Saídas

Cronograma.xlsxExcel
Personalizado · 27 colunasExcel
Integridade · 6 abasExcel
relatorio-geral.pdfPDF

Dynamic Mode everywhere

Every saved report and dashboard recalculates itself when you upload a new .xer.

Itens salvos

Curva Financeira — Jul/26
KPIs de EVM
14 Pontos DCMA
Relatório Geral

recalculam ao trocar o cronograma ativo

Unlimited conversions. Unlimited analysis.

Everything you saw above is included in Gamtty Pro. Monthly subscription, no lock-in — and the free conversion stays available so you can try it before deciding.

Gamtty

Pricing

Check out the prices for the Free plan and Gamtty Pro, billed monthly or annually.

Free

$0

For occasional conversions.

  • 3 conversions per month
  • Excel export with WBS
  • Excel export with Gamtty branding
  • Priority processing, no queue
  • Early access to new features
  • Dashboard with curves, SPI and CPI
  • Result slides in your company's palette
  • Priority email support
Current Plan
Most popular

Gamtty Pro

$4/mo

Everything in Free, with no limits.

  • Unlimited .XER file conversions
  • Excel export without branding
  • Priority processing, no queue
  • Full access to Gamtty Workspace (S-Curve, KPIs, DCMA, dashboards)
  • Early access to new features
  • Result slides in your company's palette
  • Priority email support
Subscribe to ProTry Pro free for 7 days

Compare plan features

Free
Pro
Conversions and processing
XER file conversions
Import Primavera P6 schedules straight from the browser, nothing to install.
3 / month
Unlimited
Excel export with WBS
Spreadsheet organized by the project's WBS structure, ready to detail with the team.
Excel export without branding
Excel files exported without the Gamtty branding band.
Priority processing, no queue
Your files go first, no waiting behind free-plan conversions.
S-Curve, charts and KPIs
Custom S-Curve
Baseline x Actual x Remaining, physical or financial, with automatic split at the Data Date and monthly or annual periods.
Resource Charts
Allocation histogram, leveling, and a combined view with cumulative curve, by resource or discipline.
EVM KPIs
13 indicators — SPI, CPI, PPC, EAC, and schedule/cost variances — calculated using Earned Value.
Dynamic Mode
Saved curves, charts and KPIs recalculate themselves with every new .xer imported.
Schedule quality
Baseline Adherence
Scope, weighting, logic, duration, critical path and milestones — current x baseline across 6 dimensions.
14-Point DCMA Audit
The checklist used by agencies and major contractors, with per-activity detail on every point.
Dashboards and reports
Custom dashboards
Build panels combining S-Curve, charts, KPIs, and quality cards saved from the project.
Full Report in PDF
Choose the sections — KPIs, curves, charts, DCMA, milestones, critical path — and export a laid-out PDF in one click.
Results and support
Result slides in your company's palette
Export to PDF or PPT ready to present, with your company's color palette and layouts.
Early access to new features
Try every Gamtty release before it reaches everyone else.
Priority email support
Direct response from the Gamtty team, no support queue.

Frequently asked questions

Every .XER file processed, whether the current schedule or the baseline, counts as one conversion. The Free plan gives you 3 conversions per month; Pro is unlimited.
Yes. The subscription is monthly, with no commitment, and you can cancel directly from your account at any time.
Yes. Uploaded files are processed securely and are never shared with third parties.
Gamtty currently processes .XER files exported from Primavera P6.
Yes. Support is handled through tickets inside the app, available on the Free plan too. Pro subscribers get priority support.