Send the .XER file
Exported straight from Primavera P6, by drag or selection. Files up to 100 MB.
From .XER to structured Excel — WBS, colors, and collapsible groups just like in Primavera
click here to browse
Turn your Primavera P6 .XER file into a complete Excel spreadsheet — with the full WBS, colors by hierarchy level, and standard-format dates — exactly like the original schedule.
Primavera P6 — source
| Activity ID | Activity Name | Dur. | Start | Finish |
|---|---|---|---|---|
| EC00515 | City Center Office Building | 681 | 01-Nov-10 | 03-Jul-13 |
| D&E | Design and Engineering | 107 | 01-Nov-10 | 06-Apr-11 |
| EC1000 | Design Building Addition | 55 | 01-Nov-10 | 19-Jan-11 |
| EC1050 | Assemble Technical Data | 7 | 16-Feb-11 | 25-Feb-11 |
| Found | Foundation | 146 | 23-Feb-11 | 19-Sep-11 |
| EC1100 | Site Preparation | 43 | 23-Feb-11 | 18-Apr-11 |
Excel — Gamtty output
| Activity ID | Activity Name | Dur. | Start | Finish |
|---|---|---|---|---|
| EC00515 | City Center Office Building | 681 | 01/11/2010 | 03/07/2013 |
| D&E | Design and Engineering | 107 | 01/11/2010 | 06/04/2011 |
| EC1000 | Design Building Addition | 55 | 01/11/2010 | 19/01/2011 |
| EC1050 | Assemble Technical Data | 7 | 16/02/2011 | 25/02/2011 |
| Found | Foundation | 146 | 23/02/2011 | 19/09/2011 |
| EC1100 | Site Preparation | 43 | 23/02/2011 | 18/04/2011 |
Exported straight from Primavera P6, by drag or selection. Files up to 100 MB.
Full hierarchy reassembled level by level, with calendars, durations and dates converted automatically.
Collapsible groups, colors per level and standard dates — ready for meetings and reports.
The shortest path between planning and the decision.
From .xer to final report: S-Curve, dashboards, EVM KPIs, and DCMA audit — calculated straight from your Primavera P6, no intermediate spreadsheet. Your project: less spreadsheet, more planning.
Faithful reproduction of the interface — build yours with your project's saved items, in a free layout
The S-Curve your client asks for, without leaving the browser
Baseline × Actual × Remaining calculated with P6's real calendar and Primavera's own resource curves. Physical or financial, in custom periods.
13 EVM indicators calculated on the spot
SPI, CPI, EAC, PPC, schedule and cost variances — straight from the baseline × current comparison, with the Earned Value criteria audits recognize.
14-Point DCMA audit in seconds
The same checklist used by agencies and major contractors to fail schedules — run it before your client does.
The entire status report, in PDF, in one click
Choose the sections — KPIs, curves, charts, DCMA, milestones, critical path — and Gamtty builds a laid-out PDF, ready for the meeting.
Six capabilities that come with the subscription, on top of the S-Curve, the KPIs and the DCMA audit.
Everything you saw above is included in Gamtty Pro. Monthly subscription, no lock-in — and the free conversion stays available so you can try it before deciding.
Check out the prices for the Free plan and Gamtty Pro, billed monthly or annually.
For occasional conversions.
Everything in Free, with no limits.